Maintenance of ring main unit equipment
1. Daily maintenance
(1) Daily spot check
①Cabinet body: no deformation, dirty.
Cabinet door: no opening, gaps.
Cabinet top: no foreign objects, leakage.
Observation window: no broken glass
②Charged display device: cyclic flashing, normal display.
Ammeter: normal in current range.
Isolated knife switch: no overheating, discolouration at static and dynamic knife contact
High-voltage fuse: no overheating, discolouration
(2) Daily tidying up.
① Wipe the top, body and glass window of the ring network cabinet during inspection
② Keep the insulation board clean and tidy and free of dust
2. Maintenance
(1) Daily maintenance.
①Wipe the top of the ring network cabinet, cabinet body and glass window.
② Visual inspection: the charged indicating device works normally.
Cabinet lighting: no loose bulbs and reliable wiring connections.
Cables: no loose overheating.
Instrument room fuse: no fused fuse, overheating
Instrument room terminals: wiring is firm and not off
③ Daily maintenance cycle: 1 time/day
(2) Secondary maintenance
①Load switch of ring network cabinet: fasten the connecting screws and blow the dust
②Inlet and outlet terminals: fasten the connecting screws and blow the dust
③Fuse: blowing dust
④High-voltage current transformer: fasten the connecting screws and blow the dust
⑤ Maintenance cycle: 2 times/year
3. Simple exception handling
(1)No display on the current meter of the ring network cabinet.
①Check whether the control fuse is damaged
②Check whether the secondary control line is off
③Check whether the low voltage control power supply from the transformer to the ring main unit is normal
(2)Lighting inside the ring main unit
①Check whether the low voltage control power supply from the transformer to the ring main unit is normal
②Check whether the light bulb is damaged
- Home
- About Us
- Products
- Earthing Switch
- Circuit Breaker Contact
- Insulation Accessories
- Switchgear Accessories
- Circuit Breaker Accessories
- Vacuum Circuit Breaker
- Medium Voltage Switchgear
- Vacuum Contactor
- Auxiliary Switch
- Load Break Switch
- SF6 Load Break Switch
- Indoor SF6 Load Break Switch Accessories
- Gas Insulated Switchgear Accessories
- G spring operating mechanism
- SF6 spring operating mechanism
- CT spring operating mechanism
- VCB spring operating mechanism
- Isolating Switch
- Transformer
- News
- Liyond Dynamic
- Liyond will attend Electric Indonesia 2019 from 11-14th.September
- Liyond will attend 2019 ELCOM UKRAINE from 09-12 April
- Liyond attended Electrical networks of Russia-2018 Exhibition
- Liyond’s Electrical Networks of Russia 2017 Exhibition–Successful conclusion!!!
- Liyond will attend Electrical networks of Russia-2017
- Liyond will attend ELEKTRO 2016 Exhibition on June 6th-9th
- LIYOND is in 2016 Hannover Messe these days!
- Liyond HANNOVER MESSE 2016 Exhibition on April 25-29
- Liyond Electric co.,ltd attends ELEKTRO 2015 Exhibition
- LIYOND will attend ELEKTRO 2015 Exhibition
- Liyond will attend HANNOVER MESSE 2015 Exhibition.
- Liyond attends Iran International Electricity Exhibition 2014
- Liyond will attend Iran International Electricity Exhibition 2014.
- Liyond Electric co.,ltd attends Elektro’2014 Russian Exhibition
- lndustry knowledge
- Liyond Family
- Liyond Dynamic
- Support
- Contact Us